Mobile Tower Installation : How to Apply for Airtel, Jio & VI, Costs, and Official Approvals
Indiaâs digital push has simplified how property owners can apply for mobile tower installationâbut only if you follow the official route. Most permissions flow through a centralized system and licensed infrastructure providers, not middlemen.
Before you consider contracts or talk numbers on mobile tower installation cost, make sure you understand todayâs rules, safety norms, and whoâs authorised to install equipment.
Approvals, safety norms, and what changed recently
Under the Indian Telegraph Right of Way (RoW) framework, 2016 (amended in 2022â23), approvals have been streamlined via the GatiShakti Sanchar portal for faster rollouts. For towers on private property, the national rules say no permission is requiredâonly an intimation to the local authority along with a structural safety certificate from an authorised engineer. Administrative charges for a tower are indicated at âč10,000 in the RoW schedule, though some states are still aligning their by-laws with the central rules.
On radiofrequency safety, India revised its base-station exposure limits on January 6, 2025 to one-fifth of ICNIRP guidelines (earlier one-tenth). The DoT also conducts audits and provides a public portal (Tarang Sanchar) to view towers and request EMF measurements, ensuring transparency for residents and landlords.
Costs, contracts, and avoiding fraud
For property owners, the tower company typically bears capex (civil foundation, mast, cabinets) and ongoing maintenance; you provide space, access, power availability, and legally valid ownership/NOC documents. Rent and terms are negotiated in a standard lease with a legitimate infrastructure providerânever pay âregistrationâ or âprocessingâ fees to agents. The Department of Telecommunications has explicitly warned about scams promising âhigh monthly rentâ in exchange for upfront payments; associations of licensed operators confirm they do not charge owners any advance to set up a site.
A realistic approach to mobile tower installation cost is to separate your concerns: your direct outlay is usually minimal (e.g., paperwork, due diligence), while tower deployment, strengthening, and compliance rest with the licensed company. Focus negotiations on tenure, escalation, site access, and power arrangements rather than headline rent claims you canât verify.
How to apply the right way (Airtel, Jio, VI)
Do not apply through random emails or social media posts. Use verified channels of licensed âIP-1â infrastructure providers and operator-affiliated tower companies. For Airtel and VI coverage, Indus Towers runs an official landlord intake (web form and helpline). Jio uses Summit Digitel for passive infrastructure; property owners can approach them directly. ATC India is another large independent towerco with a public âapply for towerâ form. Telcos then use the GatiShakti Sanchar portal to obtain statutory RoW permissions.
Three quick operator mini-guides
airtel tower installation: Submit property details to Indus Towers; they shortlist based on radio planning gaps, power availability, and access. Expect site survey and structural check before any lease. Rent and terms are finalised only via official Indus documentation.
jio tower installation: Approach Summit Digitel (Jioâs primary passive infra partner). If your location fits their coverage plan, theyâll conduct feasibility, compliance checks, and move to a formal lease. Never pay intermediariesâJio/Summit wonât ask for upfront fees.
vi tower installation: Like Airtel, VI largely uses Indus Towers for new sites. Provide rooftop/open-plot details, and keep ownership and NOC documents ready for verification. All paperwork and payments are via Indusâs official channels only.
Site readiness and rooftop essentials
For rooftop mobile tower installation, authorities may require a structural stability certificate from a licensed engineer and building-owner NOCs. Plan for safe equipment access, 24Ă7 security, earthing, and reliable power with metering as per local norms. Indiaâs EMF framework is audited by DoT field units and remains well within international safety recommendations; you can view nearby towers or request measurements on Tarang Sanchar for added assurance.
Quick checklist
- Ownership proof, clear title/consent from all co-owners or society
- Rooftop/plot dimensions, approach road, lift/stair access
- Power availability and space for metering/cables
- Willingness to host shelter/cabinets as per design
- Awareness of updated EMF limits and local by-law alignment status
Conclusion
If youâre serious about hosting a tower, start with authorised providers, not classifieds or unsolicited calls. Use official landlord pages, keep documents ready, and verify every offer against DoT advisories and the GatiShakti Sanchar portal. Ready to move? Share your property details with a legitimate towerco and take the next step the right way.