Mobile Tower Guide: Jio | Airtel | Vi
If you have vacant land or a terrace, this step-by-step guide explains how mobile tower installation really worksâwhat to prepare, how to apply, and how to avoid scams.
Eligibility, Process & tower lease rent Basics
First confirm ownership or a valid lease for the property; keep title papers, PAN, recent electricity bill, and property-tax receipt handy. Most operators require a structural stability certificate from a licensed engineer to verify that your roof or plinth can safely bear equipment and mast loads. A dedicated power supply with a separate meter is preferred, along with 24/7 access for maintenance teams. You may also need local approvals and a society NOC; this is often part of the standard checklist for urban buildings and gated communities.
Apply only through official operator portals or authorized IP-1 (infrastructure) companies. Genuine teams do a site survey first, share a draft agreement, and then move to permissions and installation; they never ask for âregistration feesâ or cash deposits upfront. The agreement should spell out tenure, rent escalation, power reimbursement, access rules, insurance and liability, and restoration duties when the site is decommissioned. For mobile tower permission, expect basic compliance displays on the roof, safety barricading during work, and clear emergency contacts.
Quick details:
- Core documents: ownership/lease proof, ID/PAN, electricity bill, property-tax receipt, structural stability certificate
- Typical flow: enquiry â survey â draft agreement â approvals/NOC â installation â commissioning
- Red flags: upfront payment demands, unofficial emails, no physical survey, or vague contracts
Jio tower: Selection, Survey & Agreement
Begin by submitting your site through Jioâs official channel or its listed infrastructure partners. The network team first checks coverage gaps, power availability, and backhaul feasibility near your address. If the location looks promising, a technical crew inspects access routes, lift/hoisting options, antenna clearances, cable paths, and the condition of waterproofing. Post-survey, you receive a draft agreement with site drawings, equipment layout, and a schedule for installation and testing.
During installation, expect barricading, safety signage, proper earthing, and lightning protection as per standard practice. Keep a weather-proof area ready for the rack and ensure the meter board is accessible. Payment terms (monthly or quarterly), TDS/GST handling, and any rent escalation should be clearly written into the annexures. After commissioning, routine maintenance visits are scheduled; youâll be asked to provide timely access and keep the roof clutter-free.
Quick details:
- Start point: official Jio portal or authorized IP-1 partner
- Good to prepare: clear access, dedicated power meter, and a safe hoisting plan
- Paperwork to review: rent, escalation, power reimbursement, insurance & liability clauses
Airtel tower: Readiness, Permissions & Handover
Airtel and its infra partners shortlist sites using network planning tools and field intelligence. Your biggest lever is structural readiness: secure a fresh certificate if your building is older or has recently added floors or solar panels. Keep the terrace tidy; mark a safe material path from gate to roof and plan temporary protection for tiles or waterproofing. Ask the team to document cable routing, earthing points, and the exact antenna positions to prevent future disputes.
Permissions usually include a society NOC (where applicable) and adherence to local by-laws. Expect visible EMF/safety signage on the roof and a contact number for complaints. Clarify access rules in the contractâ24/7 breakdown access, visitor logs, and emergency keys. Also capture responsibilities for post-work waterproofing and any roof restoration if the site is ever removed. Invoices, power readings, and payment confirmations should flow through a single point of contact for transparency.
Quick details:
- Essentials: updated structural certificate, society NOC, clean access route, safe storage space
- Ask for: layout drawings, earthing locations, lightning protection plan
- Contract focus: access windows, power reimbursement method, restoration obligations
Vi tower: Documentation, Safety & Upkeep
Viâs process mirrors industry norms: submit interest via official channels, then wait for a planning review and on-site survey. During the survey, teams map the rack area, antenna azimuths, and cable trays; they also check slab condition and drainage. You should confirm that temporary hoarding and PPE are used during installation and that safety cones and barricades remain around high-risk spots. Keep neighbors informedâclear signage and a visible helpline reduce misunderstandings.
Review the agreement for relocation rights, notice periods, rent escalation, and termination conditions. Clarify who pays for civil fixes like re-sealing cable entry points or repairing parapet damage. Maintain a file of invoices, rent receipts, power bills, and TDS certificates to simplify accounting. Schedule joint inspections after heavy rains or storms to spot any waterproofing issues early.
Quick details:
- First step: official Vi portal or verified IP-1 partner
- Compliance to expect: safety signage, barricading, proper earthing, tidy cable management
- Finance hygiene: clear payment cycle, tax treatment, and records of readings/payments
Conclusion: Your Next Three Steps
- Gather documents and get a structural stability certificate so your site is survey-ready.
- Submit your property only through official operator channels or verified infrastructure partnersâignore anyone asking for money before a physical survey and a written agreement.
- During installation, supervise access, ensure waterproofing is protected, and keep an organized trail of invoices and receipts.